Sunday, June 8, 2014

New holding Tank Project

I completed installing the tank level sensor and calibrated it with fresh water.





The final installation in the boat and level sensor wired to the monitor.
And then installed the new floor panel.
Once I complete the plumbing to the tank will refinish the sole with Minwax Polyurethane.  I hope I have time to finish this while I have the boat here in the marina.


No comments:

Post a Comment